NEW QUESTION 211
The process of determining in detail the amount of labor and machine resources needed to achieve the required production id known as:

  • A. Capacity Requirements Plan
  • B. Material Requirement Plan
  • C. Production Plan
  • D. Resource Plan

Answer: A

 

NEW QUESTION 212
Companies that produce a narrow range of high-volume products will most likely choose which of the following processes?

  • A. Batch
  • B. Jobbing
  • C. Project
  • D. Line

Answer: D

 

NEW QUESTION 213
What is the reason for using the sample inspection?

  • A. human error is estimated to be as high as 20% when performing long-term repetitive testing
  • B. All of the above
  • C. testing the product is destructive
  • D. there is not enough time to give 100% inspection to a batch of product

Answer: B

 

NEW QUESTION 214
and uncouples the sales forecast from manufacturing by establishing a manufacturing plan

  • A. MPS and chase strategy
  • B. MRP and MRP II
  • C. Production plan, MPS
  • D. MRP and production plan

Answer: C

 

NEW QUESTION 215
Toyota has designed seven important sources of waste in manufacturing. The first four relate to the design of the manufacturing system and the last there to the operation and management of the system. Which one of the following is NOT out of those sources of waste?

  • A. Bottlenecks
  • B. Movement
  • C. Product Defects
  • D. Overproductions

Answer: A

 

NEW QUESTION 216
Today production control works in a demanding environment shaped by six major challenges. Which one of the following is not of those challenges?

  • A. Customer that are never satisfied
  • B. A supply chain that is large and must be manage
  • C. A product life cycle that is getting shorter and shorter
  • D. None of these

Answer: D

 

NEW QUESTION 217
What includes the functions of establishing specifications, selecting suppliers, price determination, and negotiation?

  • A. Procurement
  • B. Supplier scheduling
  • C. Competitive follow-up
  • D. None of the above

Answer: A

 

NEW QUESTION 218
The inputs needed for a capacity requirement plan are open shop orders, planned order releases, routings, time standards and work center capacities, this all information can be obtained from:

  • A. Open order file
  • B. All of the above
  • C. Routing file
  • D. Material Requirements Plan

Answer: B

 

NEW QUESTION 219
The total line-haul cost varies with:

  • A. cost per mile
  • B. the distance moved
  • C. weight moved
  • D. Only A and B

Answer: D

 

NEW QUESTION 220
Which of the following is/are included in five major levels in the manufacturing planning and control system?

  • A. All of these
  • B. Production plan
  • C. Strategic business plan
  • D. Master production schedule

Answer: A

 

NEW QUESTION 221
Which of the following best describes sole sourcing?

  • A. One supplier exists and is utilized
  • B. Multiple potential suppliers, 2-3 are chosen to be the only suppliers for an organization
  • C. One supplier exists, but is not utilized
  • D. Multiple potential suppliers, one is chosen to be the only supplier for an organization

Answer: A

 

NEW QUESTION 222
The planning horizon is the time span for which plans are made. It must cover a period at least equal to the time required to accomplish the plan. For Mater production scheduling, the minimum planning horizon is:

  • A. The longest cumulative or end-t-end lead time (LT)
  • B. The difference between the productions of two different batches
  • C. None of these
  • D. The shortest lead time

Answer: A

 

NEW QUESTION 223
Which method influences the risk of damage and breakage?

  • A. density
  • B. value
  • C. Packaging
  • D. Perishability

Answer: C

 

NEW QUESTION 224
The planning horizon is usually and is reviewed perhaps .

  • A. 6-8 months, each month or quarter
  • B. 8-12 months, each month
  • C. 5-8 months, each quarter
  • D. None of these

Answer: A

 

NEW QUESTION 225
To maintain the desired level of customer service by maintaining finished-goods inventory levels or by scheduling to meet customer delivery requirements.
1. To make the best use of material, labor and equipment.
2. To maintain inventory investment at the required levels.
These are the objectives of:

  • A. Production plan
  • B. MRP
  • C. MPS
  • D. MPR II

Answer: C

 

NEW QUESTION 226
A work center is available 120 hours but actually produced goods for 100 hours. What is the utilization of the work center?

  • A. 83.5%
  • B. 83.3%
  • C. 84%
  • D. 84.3%

Answer: B

 

NEW QUESTION 227
Which business process is concerned with the replenishment of items and usually occurs on a weekly basis?

  • A. S&OP
  • B. MPS
  • C. RCCP
  • D. Business Planning

Answer: B

 

NEW QUESTION 228
In s distribution system, which activity affects customer service and the cost of providing it?

  • A. Order processing and communication
  • B. All of the above
  • C. Warehouses
  • D. Distribution inventory

Answer: B

 

NEW QUESTION 229
Inventories are part of planning process and provide buffer against:

  • A. Differences in demand and production rates
  • B. Demand rates
  • C. Production rates
  • D. None of these

Answer: A

 

NEW QUESTION 230
Which one of the following statements is about capacity requirements planning?

  • A. Both A&B
  • B. Involves translating monthly, quarterly or annual product priorities from the production plan into some total measure of capacity, such as gross labor house.
  • C. This type of planning focuses on components parts, grater detail is involved than in roughcut capacity planning.
  • D. It is directly liked to the material requirements plan

Answer: A

 

NEW QUESTION 231
In 1 week, a work center produces 85 standard hours of work. The hours scheduled are 80, and 75 hours are actually worked. Calculate the utilization and efficiency of the work center.

  • A. 97.75% and 113.33%
  • B. 93.75% and 113.33%
  • C. None of the above
  • D. 93.75% and 110.33%

Answer: B

 

NEW QUESTION 232
If the efficiency of the work center in the above question is 115%. What is the rated capacity of the work center?

  • A. 279 Standard hours per week
  • B. 287 Standard hours per week
  • C. None of these
  • D. 276 Standard hours per week

Answer: D

 

NEW QUESTION 233
......