APICS CPIM Test Engine Practice Test Questions, Exam Dumps
100% Free CPIM Daily Practice Exam With 590 Questions
The APICS CPIM (Certified in Production and Inventory Management) Certification Exam is a globally recognized certification program designed for individuals seeking to enhance their skills and knowledge in the field of production and inventory management. The program consists of five modules, each covering key aspects of the production and inventory management process, including planning, scheduling, inventory control, and supply chain management.
NEW QUESTION # 260
Which of the following is NOT the dimension to quality measurements?
- A. Function
- B. Accuracy
- C. Aesthetic
- D. Production
Answer: D
NEW QUESTION # 261
Identify the problem, generate ideas about main causes of problem, brainstorm all possible causes for each main cause and try to identify the most likely root cause are all the steps of:
- A. Pareto diagram
- B. Schematic of a process
- C. Cause-and-effect diagram
- D. Component diagram
Answer: C
NEW QUESTION # 262
The cost of avoiding trouble by doing the job right in the first place is known as:
- A. Production cost
- B. Prevention cost
- C. Deterrence cost
- D. Anticipation cost
Answer: B
NEW QUESTION # 263
A schedule (priority plan) that establishes to show the components required at each level of the assembly and based on lead time, calculates the time when these component will be needed called:
- A. Inventory control Planning
- B. Master Production Schedule
- C. B & C
- D. Material Requirements Planning
Answer: D
NEW QUESTION # 264
The function of selecting and sequencing available jobs to be run at individual work centers is known as:
- A. Dispatching
- B. Decentralization
- C. Sequencing
- D. Devolution
Answer: A
NEW QUESTION # 265
A distributor has decided to implement push replenishment throughout its network. Which action is most consistent with this decision?
- A. establishing double order points
- B. establishing a bill of distribution
- C. establishing safety stocks
- D. establishing lead times
Answer: B
NEW QUESTION # 266
A guide for all in the organization about how products and services should be provided is known as:
- A. Quality policy statement
- B. Total workflow
- C. Commitment
- D. Customer focus
Answer: A
NEW QUESTION # 267
What can be based on characteristics such as customer grouping, demand characteristics, or degree of customization?
- A. Functional focus
- B. Process focus
- C. Product and market focus
- D. Focused factory
Answer: C
NEW QUESTION # 268
Which of the following is/are included in five major levels in the manufacturing planning and control system?
- A. Master production schedule
- B. Strategic business plan
- C. All of these
- D. Production plan
Answer: C
NEW QUESTION # 269
What is concerned with the transfer of ownership and its function is to negotiate, sell, and contract?
- A. Transaction channel
- B. Business channel
- C. Distribution channel
- D. Contracted channel
Answer: A
NEW QUESTION # 270
Goods or services satisfy the needs and expectations of the user, this refers to:
- A. Stability
- B. Quality
- C. Maintainability
- D. Reliability
Answer: B
NEW QUESTION # 271
A systematic, formal, and conscious procedure for testing to determine customer opinion or intention is called:
- A. Record customer group
- B. None of the above
- C. Market research
- D. Forecasting procedure
Answer: C
NEW QUESTION # 272
A company normally ships to a customer by rail at a cost of $500 per load. The transit time is fourteen days. The goods can be shipped by truck for $700 per load and transit time of four day. If transit inventory cost is $35 per day, what does it cost to ship each way?
- A. Rail: $990 and Truck: $ 840
- B. Rail: $980 and Truck: $ 880
- C. Rail: $900 and Truck: $ 890
- D. Rail: $970 and Truck: $ 870
Answer: A
NEW QUESTION # 273
What is a problem for manufacturing, but it can be attained by overtime or under-time, shifting workers, and so forth?
- A. Working center control
- B. Input/Output rate
- C. Capacity change
- D. Risk disbursement
Answer: C
NEW QUESTION # 274
* High quality level
* High flexibility to change such things as volume, specifications, and delivery
* High service level
* Short lead times
* Low variability in meeting targets
* Low cost
These are general requirements of:
- A. Suppliers
- B. Sub-contractors
- C. Customers
- D. All the supply chain agents
Answer: A
NEW QUESTION # 275
......