NEW QUESTION 205
The order picker circulates throughout the warehouse selecting the items on the order through:

  • A. Pick and choose system
  • B. Managing system
  • C. Zone system
  • D. Area system

Answer: D

 

NEW QUESTION 206
Showing the scope of the quality management system is known as:

  • A. procedure
  • B. practice
  • C. policy
  • D. plan

Answer: C

 

NEW QUESTION 207
A planned decision by the organization to select one supplier for an item when several sources are available is called:

  • A. sole sourcing
  • B. single sourcing
  • C. unique sourcing
  • D. singular sourcing

Answer: B

 

NEW QUESTION 208
A routing file should contain the following information EXCEPT:

  • A. Work centers to be used
  • B. Sequence of operations
  • C. Operations to be performed
  • D. Priority plan

Answer: D

 

NEW QUESTION 209
Forecasts are more accurate for larger groups of items than for individual items in a group?

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 210
Over a 4-week period a work center produced 540 standard hours of work was available for 640 hours, and actually worked 480 hours. Calculate the utilization and the efficiency of the work center.

  • A. 76%, 112.95%
  • B. 75%, 112.9%
  • C. 75%, 110%
  • D. 75%, 110%

Answer: B

 

NEW QUESTION 211
Frozen zone, slushy zone and liquid zone are the part of

  • A. Planning time fence
  • B. MPS
  • C. Scheduled receipts
  • D. Projected available balance

Answer: A

 

NEW QUESTION 212
Capacity planning links the various production priority schedules to :

  • A. Manufacturing resources
  • B. Manufacturing plans
  • C. All of these
  • D. MRP

Answer: A

 

NEW QUESTION 213
Which of the following defines what materials have to be scheduled to make the end products?

  • A. Master production schedule
  • B. All of the Above
  • C. Engineering change control bill
  • D. Bills of material

Answer: D

 

NEW QUESTION 214
In s distribution system, which activity affects customer service and the cost of providing it?

  • A. Order processing and communication
  • B. All of the above
  • C. Distribution inventory
  • D. Warehouses

Answer: B

 

NEW QUESTION 215
Material Requirements Planning (MRP) is:

  • A. All of the above
  • B. The system used to avoid missing parts.
  • C. A schedule establish for the production agenda
  • D. The system used to provide available inventory

Answer: B

 

NEW QUESTION 216
The bill of material shows

  • A. Both A & B
  • B. None of the above
  • C. The steps or process used to make the parent or the components
  • D. The components that go into making the parent

Answer: D

 

NEW QUESTION 217
____________________ are concerned with the end use of the item and what the item is expected to do.

  • A. Quality assurance
  • B. Performance requisition
  • C. Functional specifications
  • D. Price requirements

Answer: C

 

NEW QUESTION 218
Errors will always be made, but defects can be removed.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 219
The time a job waits at a work center before being handled is called:

  • A. Linger time
  • B. Interval time
  • C. Wait time
  • D. Queue time

Answer: D

 

NEW QUESTION 220
For back scheduling we need to know?

  • A. All of these
  • B. Setup and run time for each operation
  • C. Quantity and due date
  • D. Sequence of operations and Work centers needed

Answer: A

 

NEW QUESTION 221
The planning horizon is the time span for which plans are made. It must cover a period at least equal to the time required to accomplish the plan. For Mater production scheduling, the minimum planning horizon is:

  • A. The difference between the productions of two different batches
  • B. The shortest lead time
  • C. The longest cumulative or end-t-end lead time (LT)
  • D. None of these

Answer: C

 

NEW QUESTION 222
......


APICS CPIM Exam Syllabus Topics:

TopicDetails
Topic 1
  • Strategic Management of Resources.
Topic 2
  • Basics of Supply Chain Management
Topic 3
  • Master Planning of Resources

 