NEW QUESTION 205
The order picker circulates throughout the warehouse selecting the items on the order through:
- A. Pick and choose system
- B. Managing system
- C. Zone system
- D. Area system
Answer: D
NEW QUESTION 206
Showing the scope of the quality management system is known as:
- A. procedure
- B. practice
- C. policy
- D. plan
Answer: C
NEW QUESTION 207
A planned decision by the organization to select one supplier for an item when several sources are available is called:
- A. sole sourcing
- B. single sourcing
- C. unique sourcing
- D. singular sourcing
Answer: B
NEW QUESTION 208
A routing file should contain the following information EXCEPT:
- A. Work centers to be used
- B. Sequence of operations
- C. Operations to be performed
- D. Priority plan
Answer: D
NEW QUESTION 209
Forecasts are more accurate for larger groups of items than for individual items in a group?
- A. True
- B. False
Answer: A
NEW QUESTION 210
Over a 4-week period a work center produced 540 standard hours of work was available for 640 hours, and actually worked 480 hours. Calculate the utilization and the efficiency of the work center.
- A. 76%, 112.95%
- B. 75%, 112.9%
- C. 75%, 110%
- D. 75%, 110%
Answer: B
NEW QUESTION 211
Frozen zone, slushy zone and liquid zone are the part of
- A. Planning time fence
- B. MPS
- C. Scheduled receipts
- D. Projected available balance
Answer: A
NEW QUESTION 212
Capacity planning links the various production priority schedules to :
- A. Manufacturing resources
- B. Manufacturing plans
- C. All of these
- D. MRP
Answer: A
NEW QUESTION 213
Which of the following defines what materials have to be scheduled to make the end products?
- A. Master production schedule
- B. All of the Above
- C. Engineering change control bill
- D. Bills of material
Answer: D
NEW QUESTION 214
In s distribution system, which activity affects customer service and the cost of providing it?
- A. Order processing and communication
- B. All of the above
- C. Distribution inventory
- D. Warehouses
Answer: B
NEW QUESTION 215
Material Requirements Planning (MRP) is:
- A. All of the above
- B. The system used to avoid missing parts.
- C. A schedule establish for the production agenda
- D. The system used to provide available inventory
Answer: B
NEW QUESTION 216
The bill of material shows
- A. Both A & B
- B. None of the above
- C. The steps or process used to make the parent or the components
- D. The components that go into making the parent
Answer: D
NEW QUESTION 217
____________________ are concerned with the end use of the item and what the item is expected to do.
- A. Quality assurance
- B. Performance requisition
- C. Functional specifications
- D. Price requirements
Answer: C
NEW QUESTION 218
Errors will always be made, but defects can be removed.
- A. True
- B. False
Answer: A
NEW QUESTION 219
The time a job waits at a work center before being handled is called:
- A. Linger time
- B. Interval time
- C. Wait time
- D. Queue time
Answer: D
NEW QUESTION 220
For back scheduling we need to know?
- A. All of these
- B. Setup and run time for each operation
- C. Quantity and due date
- D. Sequence of operations and Work centers needed
Answer: A
NEW QUESTION 221
The planning horizon is the time span for which plans are made. It must cover a period at least equal to the time required to accomplish the plan. For Mater production scheduling, the minimum planning horizon is:
- A. The difference between the productions of two different batches
- B. The shortest lead time
- C. The longest cumulative or end-t-end lead time (LT)
- D. None of these
Answer: C
NEW QUESTION 222
......
APICS CPIM Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|