[Apr 01, 2022] Step by Step Guide to Prepare for C-TPLM30-67 Exam BrainDumps [Q11-Q33]

Share

Apr 01, 2022 Step by Step Guide to Prepare for C-TPLM30-67 Exam BrainDumps

SAP Application Associate C-TPLM30-67 Real Exam Questions and Answers FREE Updated on 2022


SAP C-TPLM30-67 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Configure the Organizational Units required for processing Maintenance
  • Customizing Preventive Maintenance
Topic 2
  • Customizing Analysis and Reporting
  • Configure the required master data and related elements
Topic 3
  • Configure the necessary maintenance plan elements used in Prevenative Maintenance
  • Configure the settings required for Maintenance processing
Topic 4
  • Customizing Organizational Units
  • Customizing Refurbishment
Topic 5
  • Configure the Technical Objects used in Maintenance & Repair transactions
  • Maintain Equipment master data, BOMs, and Classification settings
Topic 6
  • Describe the business processes associated with Preventive Maintenance
  • Planning Preventative Maintenance Business Processes
Topic 7
  • Configure and execute various reporting options for maintenance
  • Customizing Maintenance Processing

 

NEW QUESTION 11
Your customer wants to assign maintenance orders to network activities automatically with the
Maintenance Event Builder (MEB).
Which of the following steps must you perform?
There are 2 correct answers to this question.
Response:

  • A. Assign maintenance orders manually to a revision with revision type WPS-controlled.
  • B. Assign a hierarchical task list to a notification.
  • C. Set the define Transfer of Project or Invest Program indicator.
  • D. Assign the Reference PM/PS element to task list headers and network activities.
  • E. Assign a network to a revision with revision type WPS-controlled.

Answer: D,E

 

NEW QUESTION 12
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price.
How do you accomplish this?

  • A. Define the activity types in Controlling and assign them to the cost center of the work center.
  • B. Create various maintenance activity types in each work center and assign a price.
  • C. Create various maintenance activity types with the fixed prices and assign them to the work center.
  • D. Define the activity types for each maintenance planning plant.

Answer: A

 

NEW QUESTION 13
Refer to the Exhibit.

A customer has asked you to perform a port failover test to demonstrate system resiliency. What is needed to complete this task?

  • A. Add more cables per switch
  • B. Add more switches per controller
  • C. Switch to Legacy Port Mode
  • D. Switch to Virtual Port Mode

Answer: B

 

NEW QUESTION 14
A company is using an SC7020 array and the storage administrator wants to expand the available capacity by adding 48, 3.5" disk drives. Which expansion enclosures can be used to meet the demand?

  • A. 2x SC220 drive bays
  • B. 4x SC400 drive bays
  • C. 4x SC200 drive bays
  • D. 2x SC420 drive bays

Answer: A

 

NEW QUESTION 15
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category. Where do the material costs appear in the value categories for the order?
Please choose the correct answer.
Response:

  • A. In the internal activity value category
  • B. In the unassigned value category
  • C. In a new, automatically created value category
  • D. In the overhead value category

Answer: B

 

NEW QUESTION 16
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?

  • A. The system restarts the maintenance plan.
  • B. The system fixes the next scheduled call date.
  • C. The system retains the normal scheduled call dates.
  • D. The system reschedules all previous scheduled call dates.

Answer: C

 

NEW QUESTION 17
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.
To which parameter do you assign the costing sheet?
Please choose the correct answer.
Response:

  • A. Valuation variant
  • B. Costing type
  • C. Version for cost estimates
  • D. Valuation categories

Answer: A

 

NEW QUESTION 18
Your customer uses operating hours to execute a performance-based maintenance plan. Which of the following data must you assign in the maintenance plan header?

  • A. A technical object with a measuring point
  • B. An order type for performance-based maintenance
  • C. A cycle unit of measure with a corresponding characteristic from the measuring point
  • D. A task list for performance-based maintenance

Answer: C

 

NEW QUESTION 19
You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose three)

  • A. TECO
  • B. CRTD
  • C. CLSD
  • D. PCNF
  • E. CNF

Answer: A,C,D

 

NEW QUESTION 20
When you create a refurbishment order, which reference objects can you use? (Choose three)

  • A. Material with serial number
  • B. Equipment with serial number
  • C. Equipment without serial number
  • D. Functional location
  • E. Material without serial number

Answer: A,B,E

 

NEW QUESTION 21
Refer to the Exhibit.

You are testing failover from a host perspective. The host has been configured in a "Failover Only MPIO" configuration. When running IOmeter if the Data Path 2 cable from the host is disconnected, will the host survive the failover?

  • A. No; Failover MPIO is configured for only Data Path 1
  • B. Yes; Failover MPIO should failover
  • C. Yes; the server has Data Path 1 connected to both controllers
  • D. No; IOmeter is sending I/O only on one path

Answer: B

 

NEW QUESTION 22
What options are available in the maintenance order when you analyze costs using value categories?
There are 2 correct answers to this question.
Response:

  • A. Display of costs by responsible work center
  • B. Display of costs by individual operations
  • C. Display of values in an alternate currency
  • D. Summary of actual costs across multiple cost elements

Answer: B,D

 

NEW QUESTION 23
Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions and create maintenance orders automatically.
What must you do in Customizing?

  • A. Create a revision type and select Not WPS-Controlled.
  • B. Create a revision type and select WPS-Controlled.
  • C. Define transfer of project or investment program
  • D. Define field values for PM/PS Reference Element

Answer: B

 

NEW QUESTION 24
A customer is using an SC9000 array with two chained SC280 expansion enclosures. They need to expand its capacity by adding a third SC280 drive bay. What is the most cost efficient way to expand the array's capacity using as few chains as possible?

  • A. Add the new SC280 to a new chain on the same SAS I/O card
  • B. Install a new SAS I/O card to connect the SC280 enclosure
  • C. Add the SC280 to the same chain as the existing SC280 enclosures
  • D. Install two new SAS I/O cards and distribute the SC280 enclosures between them

Answer: C

 

NEW QUESTION 25
Which configuration represents how the back-end is cabled on an SC7020 storage array without expansion enclosures?

  • A.
  • B.
  • C.
  • D.

Answer: B

 

NEW QUESTION 26
Your customer wants to view a list of all planned materials in multiple maintenance orders with order status CRTD. Which of the following standard reports can you use to find the information required? (Choose three.)

  • A. The materials where-used report
  • B. The operation list
  • C. The order list
  • D. The order and operation list
  • E. The material availability report

Answer: C,D,E

 

NEW QUESTION 27
To which maintenance object types can you link a priority type?
There are 2 correct answers to this question.
Response:

  • A. The combination of the order category and order type
  • B. The notification type only
  • C. The order type only
  • D. The combination of the notification category and notification type

Answer: C,D

 

NEW QUESTION 28
Which is not the phase of corrective Maintenance?

  • A. Notification
  • B. Planning
  • C. Control
  • D. Base

Answer: D

 

NEW QUESTION 29
What does the maintenance plan category determine?

  • A. The type of technical object for the maintenance plan
  • B. The grouping of similar maintenance plans together for reporting
  • C. How maintenance call objects are generated for a due maintenance call
  • D. The type of maintenance call object the system generates for a due maintenance call

Answer: D

 

NEW QUESTION 30
To which objects can you assign a user status profile? (Choose three)

  • A. A maintenance plan category
  • B. An equipment category
  • C. An order type
  • D. A notification type
  • E. A task list type

Answer: B,C,D

 

NEW QUESTION 31
What are the 3 types of Order?
There are 3 correct answers to this question.
Response:

  • A. Preventive maintenance order
  • B. Refurbishment
  • C. Category
  • D. Lists
  • E. Maintenance order

Answer: A,B,E

 

NEW QUESTION 32
A customer notices a volume is using an above average amount of Tier 1 RAID 10 space. What can be done to force this data into a lower RAID set/Tier?

  • A. Take a manual snapshot
  • B. Move data to a different volume
  • C. Stop I/O to the volume
  • D. Change the storage profile of the volume

Answer: A

 

NEW QUESTION 33
......

Ultimate Guide to Prepare C-TPLM30-67 Certification Exam for SAP Application Associate: https://www.examcollectionpass.com/SAP/C-TPLM30-67-practice-exam-dumps.html