Prepare D-VXR-DY-23 Exam Questions [2024] Recently Updated Questions [Q38-Q63]

Share

Prepare D-VXR-DY-23 Exam Questions [2024] Recently Updated Questions

Give push to your success with D-VXR-DY-23 exam questions

NEW QUESTION # 38
A 4-node VxRail Model E560F solution with an embedded vCenter and Log Insight is planned for deployment.
Prior to deployment, DNS records must be created for which hosts?

  • A. vCenter Server, ESXi hosts, VxRail Manager, and Log Insight
  • B. vCenter Server, ESXi hosts, VxRail Manager, and iDRAC
  • C. vCenter Server, first ESXi host, VxRail Manager, and iDRAC
  • D. DNS records are automatically created during VxRail deployment

Answer: A


NEW QUESTION # 39
A customer is performing self-deploy of a VxRail cluster. The VxRail Deployment Wizard fails to launch. The software appears to be corrupted.
What should they do to address the issue?

  • A. Use the VMware Host Client and iDRAC to access the nodes and troubleshoot the issue.
  • B. Verify that the Configuration file is not corrupt and has all the required values.
  • C. Contact Dell support and request the nodes be reimaged.
  • D. Use the vSphere Client and troubleshoot the issue.

Answer: C


NEW QUESTION # 40
Which vSAN license is included with VxRail?

  • A. vSAN Advanced
  • B. vSAN Enterprise
  • C. vSAN Standard
  • D. vSAN for ROBO

Answer: B


NEW QUESTION # 41
What is a requirement for the Top of Rack (ToR) switches used in a VxRail implementation?

  • A. IPV4 and IPV6 Multicast
  • B. EtherChannel
  • C. MLD Querier
  • D. LACP

Answer: A


NEW QUESTION # 42
Which series of VxRail nodes are designed for general-purpose workloads with the smallest possible footprint in a 4-node configuration?

  • A. D Series
  • B. G Series
  • C. E Series
  • D. P Series

Answer: B


NEW QUESTION # 43
A local upgrade is planned for a VxRail 7.0.xxx cluster.
For which Service VMs are snapshots recommended prior to the upgrade?

  • A. VMware vCenter Appliance
    VMware vCenter Server PSC
  • B. VxRail Manager
    VMware Log Insight
  • C. VMware vCenter Appliance
    VxRail Manager
  • D. VMware vCenter Appliance
    VMware vRealize Operations

Answer: C


NEW QUESTION # 44
Which functionality is provided by the VxRail vCenter plug-in - Physical View?

  • A. BIOS and firmware versions, cluster shutdown, and initiate BIOS and firmware update
  • B. Hardware alerts, BIOS and firmware versions, and initiate a disk replacement
  • C. LED indicator activation, initiate a disk replacement, and BIOS parameter change
  • D. Hardware alerts, LED indicator activation, and initiate power supply replacement

Answer: B


NEW QUESTION # 45
Refer to the Exhibit which shows a red box around a node PSNT.

What is a characteristic of the node marked by the red box?

  • A. VxRail node that can be excluded from the initial VxRail build.
  • B. VxRail Primary node hosting the VxRail Manager VM.
  • C. VxRail Primary node hosting the NTP and DNS servers.
  • D. VxRail node hosting the DNS server.

Answer: B


NEW QUESTION # 46
View the Exhibit.

You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?

  • A. Top of Rack (ToR) switches will use two uplink ports
  • B. Two Upstream switches will be used
  • C. Two Top of Rack (ToR) switches will be used
  • D. Upstream switches will have two ISLs

Answer: D


NEW QUESTION # 47
What is the base URL for the VxRail API call?

  • A. http://<VxM_IP>/vxm/v1/
  • B. https://<VCenter_IP>/rest/vxm/v1/
  • C. https://<VxM_IP>/API/vxm/v1/
  • D. https://<VxM_IP>/rest/vxm/v1/

Answer: D


NEW QUESTION # 48
Which activities must be completed as part of VxRail hardware installation?

  • A. Verify the time setting on each node before the first-run process
    Verify existence of PSNT in the DCUI
    Confirm that the Port Group VLAN IDs are configured as intended
  • B. Configure iDRAC for remote accessibility to perform out of band system Modify and configure the default management network VLAN IDs Confirm that the external management VLAN ID is tagged
  • C. Confirm that the external management VLAN ID is tagged
    Configure iDRAC for remote accessibility to perform out of band system
    Verify the time setting on each node before the first-run process
  • D. Verify existence of PSNT in the DCUI
    Configure and use the default management network VLAN IDs
    Confirm that the Port Group VLAN IDs are configured as intended

Answer: A


NEW QUESTION # 49
Which license must be provided by the customer for a VxRail deployment with embedded vCenter?

  • A. VxRail Manager
  • B. VMware Log Insight
  • C. VMware vSphere
  • D. RecoverPoint

Answer: C


NEW QUESTION # 50
Which URL is used to enter the planning information for a new VxRail Cluster deployment?

  • A. https://dl.dell.com/downloads/DL90235_Network-Validation-Tool-for-VxRail...
  • B. https://www.dell.com/support/home/en-us/product-support/product/vxrail-s...
  • C. https://vxrailconfiguration.dellemc.com
  • D. https://etools-acg.dell.com/vxrail

Answer: C


NEW QUESTION # 51
A company wants to deploy VxRail on V Series nodes as a proof-of-concept (POC). Only one Top of Rack (ToR) switch has been provided for the POC.
What is the Dell EMC best practice recommendation in this situation?

  • A. Connect the first host NIC to the TOR switch. Daisy chain the second NIC between hosts.
  • B. Connect the first host NIC to the ToR switch. Leave the second host NIC un-cabled.
  • C. Inform the company that the POC cannot proceed without a second ToR switch.
  • D. Connect each host NIC to a port on a different switch packet buffer bank on the ToR switch. Balance the ports across two packet buffer banks.

Answer: D


NEW QUESTION # 52
An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.
What procedure would result in the quickest node addition?

  • A. VxRail Node Imaging Management
  • B. Factory Reset
  • C. RASR Factory Image Upgrade
  • D. Compute node expansion

Answer: D


NEW QUESTION # 53
A VxRail cluster is being deployed with an existing vCenter Server.
Which role needs to be assigned to the new VxRail Management User account within vCenter Server?

  • A. Administrator role
  • B. Trusted Infrastructure Administrator role
  • C. No role needs to be assigned
  • D. Read-only role

Answer: C


NEW QUESTION # 54
What is the remote management option for G Series VxRail nodes?

  • A. IPMI/BMC
  • B. iLO
  • C. iDRAC
  • D. RMM

Answer: A


NEW QUESTION # 55
What output logs are collected using the vc-support.sh script?

  • A. ESXi log bundle
  • B. vRealize Log Insight support bundle
  • C. VxRail Manager log bundle
  • D. vCenter log bundle

Answer: A


NEW QUESTION # 56
What is a valid 2-node VxRail cluster in a direct-connect configuration?

  • A. P Series with 2x 1 GbE and 2x 10 GbE and internal vCenter
  • B. E Series with 2x 1 GbE and 2x 10 GbE and external vCenter
  • C. G Series with 4x 10 GbE and external vCenter
  • D. D Series with 4x 25 GbE and internal vCenter

Answer: B


NEW QUESTION # 57
What is the maximum number of VxRail 4.7.x Clusters you can create with three G Series nodes and five E Series nodes?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 58
What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?

  • A. Secure boot must be enabled on the ESXi hosts for a successful upgrade
  • B. VxRail Manager VM must be changed to the default name to avoid an upgrade failure
  • C. External vCenter server must be upgraded after the VxRail is upgraded
  • D. vCenter Server requires a temporary IP address on a different subnet before the upgrade

Answer: D


NEW QUESTION # 59
Which two vSAN licenses include entitlement for VMware HCI Mesh? (Select 2)

  • A. Standard
  • B. Advanced
  • C. Enterprise Plus
  • D. Enterprise

Answer: C,D


NEW QUESTION # 60
You are asked to cable up a VxRail G Series cluster to a redundant pair of 1/10G switches.
What is the cabling best practice for this configuration?

  • A. Cable ports 1 and 2 to one switch. Cable ports 3 and 4 to the other switch. Cable BMC from node 1 and 2 to one switch. Cable BMC from node 3 and 4 to the other switch.
  • B. Cable ports 1 and 3 to one switch. Cable ports 2 and 4 to the other switch. Cable BMC from node 1 and 3 to one switch. Cable BMC from node 2 and 4 to the
  • C. Cable ports 1 and 2 to one switch. Cable ports 3 and 4 to the other switch.
  • D. Cable ports 1 and 3 to one switch. Cable ports 2 and 4 to the other switch.

Answer: B


NEW QUESTION # 61
What is the basis used for VMware vSAN licensing?

  • A. TB capacity per cluster
  • B. Per CPU socket
  • C. Per disk group
  • D. TB capacity per node

Answer: B


NEW QUESTION # 62
What is the VxRail maximum cluster size if using 10 GbE links?

  • A. 64 with an RPQ
  • B. 32 with an RPQ
  • C. 0
  • D. 1

Answer: A


NEW QUESTION # 63
......

Get D-VXR-DY-23 Actual Free Exam Q&As to Prepare Certification: https://www.examcollectionpass.com/EMC/D-VXR-DY-23-practice-exam-dumps.html

D-VXR-DY-23 100% Guarantee Download D-VXR-DY-23 Exam PDF Q&A: https://drive.google.com/open?id=1zcnGNNQcdDnQ_p2VkaI5YT-hbKXMh1fB