NEW QUESTION # 14
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the central storage location to the production storage location
- B. To control the flow of material from the supplier to the central storage location
- C. To control the flow of material from the production storage location to the central storage location
- D. To control the flow of material from the supplier to the production storage location
Answer: A
NEW QUESTION # 15
What can you use standard heuristics in Advanced Planning (PP/DS) for?
- A. To optimize costs and times in production plans
- B. To solve planning problems for defined objects
- C. To automate material movements in material staging
- D. To set default values in production master data
Answer: B
NEW QUESTION # 16
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To reduce the number of material masters
- B. To make the procurement easier
- C. To enable simple structuring of BOMs
- D. To make the assignment of components easier
Answer: C,D
NEW QUESTION # 17
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Capacity requirements chart
- B. Order (dispatched) chart
- C. Work center capacities chart
- D. Order (pool) chart
Answer: A,C
NEW QUESTION # 18
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?
- A. The operation is rescheduled to an alternative work center.
- B. The operation is rescheduled backwards.
- C. The operation is rescheduled in the planning direction.
- D. The operation CANNOT be dispatched.
Answer: C
NEW QUESTION # 19
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Increase the capacity supply in a time-phased interval
- B. Determine a time period with available capacity on the planning board
- C. Execute an infinite production planning run for the critical resources
- D. Reduce the planning time interval
- E. Form optimum sequences to reduce setup times
Answer: A,B,E
NEW QUESTION # 20
Which of the following is a scheduling method for a production order?
- A. Key date scheduling
- B. Lead time scheduling
- C. Determination of basic dates
- D. Determination of delivery date
Answer: B
NEW QUESTION # 21
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?
- A. Assembly processing with production orders (82)
- B. Planning at assembly level (70)
- C. Planning with final assembly (40)
- D. Production by lot size (30)
Answer: B
NEW QUESTION # 22
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?
- A. A propagation range
- B. A work center hierarchy
- C. A planning group
- D. A planning area
Answer: C
NEW QUESTION # 23
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
- A. To create a slot, neighbouring operations are moved in both planning directions.
- B. An operation is scheduled as close as possible to the desired date.
- C. Operations on multi-resources are planned finitely in a sequence.
- D. Sequencing on multi-activity resources is automatically updated during planning.
Answer: B
NEW QUESTION # 24
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative planning horizon
- B. Specify a negative PP/DS horizon
- C. Specify a negative offset time
- D. Specify a negative opening period
Answer: C
NEW QUESTION # 25
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?
- A. Batch information cockpit
- B. Batch determination
- C. Batch number assignment
- D. Batch where-used list
Answer: B
NEW QUESTION # 26
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of material (BOM) must have the same validity period.
- B. The consistency check must be performed.
- C. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- D. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- E. The lot size range must be within the lot size range of the assigned routing.
Answer: B,D,E
NEW QUESTION # 27
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. In-house production time
- C. Total replenishment lead time
- D. Operation duration
Answer: A,B
NEW QUESTION # 28
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Create an object selection variant for production-planning-related alerts
- B. Assign the overall profile to the authorization profile
- C. Create an object selection variant for alerts according to the priority of ATP categories
- D. Assign the alert profile to the overall profile
Answer: A,D
NEW QUESTION # 29
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Scheduling control > Close gap
- B. Planning mode > Bucket
- C. Scheduling control > Find slot
- D. Planning mode > Order priority
Answer: B,C
NEW QUESTION # 30
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A. Planned order or material number
- B. Lot size or material cost
- C. Alphanumeric or quota arrangement
- D. Validity period or sales order
Answer: C
NEW QUESTION # 31
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- B. Planned orders are created in MRP with reference to sales orders.
- C. Production and procurement costs are managed on the sales order item level.
- D. Net requirements calculation is carried out for every sales order individually.
- E. Storage location MRP areas are required to manage sales-order-specific stock.
Answer: B,C,D
NEW QUESTION # 32
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.
- A. Historical values
- B. Statistical procedures
- C. Forecasting
- D. Dependent requirements
- E. Planning file entries
Answer: A,B,C
NEW QUESTION # 33
You are a consultant on an SAP S/4HANA Cloud greenfield project.
Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.
- A. Accuracy
- B. Timeliness
- C. Stability
- D. Efficiency
Answer: C,D
NEW QUESTION # 34
......